Client Overlay — OCP Group · Safi · UNS Pilot Proposal

Builds on Morocco UNS Standard v0.1 and Annex A — Phosphate & Mining. Adapts the standard to OCP Safi’s existing stack (SAP S/4HANA + Azure + TEAL Technology Services + OCP-MS I-SENSE) without disrupting it. Designed to enter via ManufacturiX / InnovateX Day.


1. Why Safi (not Jorf Lasfar) for the pilot

Safi is the right size: large enough to matter (full chemical complex — phosphoric acid, fertilizers, port loading) but smaller than Jorf Lasfar’s flagship status, which means lower political stakes for a first deployment. It also sits in the OCP-MS regional footprint with Abdenour Jbili (CEO OCP-MS, Director ManufacturiX) as the senior sponsor with direct accountability for the site.

A successful Safi pilot creates the precedent for Jorf Lasfar; a failure at Jorf Lasfar would close every door.


2. Named contacts

RoleNamePath
Senior sponsorAbdenour JbiliManufacturiX Director + OCP-MS CEO
Decision-makerAhmed MahrouManufacturing SBU executive
Innovation gatekeeperMeriem BerradaHead of Digital Innovation Lab
Implementation partner (incumbent)TEAL Technology ServicesOCP–IBM JV; co-implementer not bypass
Maintenance incumbentOCP-MS I-SENSEPredictive maintenance; signals defined here are a superset, not a replacement

3. Technical scope

3.1 Bounded scope

The pilot brokers one production line at Safi — the slurry-pump → phosphoric-acid loop already covered by the Worked Example — OCP Safi Slurry Line — for 90 days, with the goal of producing a CBAM-conformant emissions extract for one fertilizer cargo.

Out of scope: rest of Safi site, Jorf Lasfar, mining sites, SAP integration beyond a one-way bridge, replacement of any existing system.

3.2 Architecture (Safi-specific)

[Safi PLCs] ──S7-TCP──▶ [Edge node: gos7 connector]
                              │
                              ▼ Sparkplug B / mTLS / TLS 1.3
                       [HiveMQ broker — on-prem at Safi]
                       │           │           │
                       ▼           ▼           ▼
              [InfluxDB]    [SAP bridge]  [CBAM aggregator]
              (operations)  (read-only)   (signed payloads only)

Broker on-prem at Safi. CBAM aggregator runs in OCP’s Azure tenant for ledger durability. SAP bridge is read-only — SAP becomes a node per Walker Reynolds’s framing, not a hub.

3.3 Conformance level

3.4 In-scope signals

Subset of Annex A §A.5/A.6 mandatory signals, restricted to the slurry → phosphoric-acid → port-loading chain:

AreaEquipmentSignals
slurry-pumppump-p301flow-rate-m3h, discharge-pressure-bar, motor-current-a, vibration-mms, energy-kwh, state
phosphoric-acidreactor-r02, absorber-a01temperature-c, pressure-bar, p2o5-pct, energy-kwh, co2-flow-kgh
power-plantboiler-b01steam-flow-tph, fuel-flow-m3h, co2-flow-kgh
port-loadingship-loader-sl01total-loaded-t, vessel-destination-iso2, bill-of-lading-id

≈ 50 signals total. CBAM-flagged signals carry §11.6 Ed25519 signatures.

3.5 Path examples

ma/ma-07/ocp/safi/slurry-pump/pump-p301/flow-rate-m3h
ma/ma-07/ocp/safi/phosphoric-acid/reactor-r02/co2-flow-kgh
ma/ma-07/ocp/safi/port-loading/ship-loader-sl01/total-loaded-t

4. Entry route

4.1 Primary: ManufacturiX / InnovateX Day

ManufacturiX is the canonical OCP innovation entry; InnovateX Day runs annually with ~2,500 applicants → 35 selected. Submission requires TRL 7–9 — this overlay is positioned at TRL 7 (validated in relevant environment via Worked Example — OCP Safi Slurry Line). Application window: December 2025; the standard is ready in time.

4.2 Secondary: OCP Foundation StartGate

If ManufacturiX timing slips, StartGate (now closed for new admissions, but legacy contacts via Sarrah Cherif D’Ouezzan remain) offers a softer adjacency.

4.3 Tertiary: TEAL co-pitch

TEAL Technology Services is the co-implementer of every OCP digital initiative. A co-pitch with TEAL bypasses some of the procurement friction; the trade-off is reduced IEIA brand visibility. Use only if direct ManufacturiX entry stalls past Q3 2026.


5. Commercial structure

5.1 Pilot offer (90 days)

ItemDetail
Duration12 weeks (90 days)
Team2 IEIA engineers on-site Safi (rotational), 1 architect remote, 1 PM
Deliverables(a) UNS broker + ACL + edge node operational; (b) ~50 signals live and conformant; (c) one CBAM-conformant emissions extract for a real fertilizer cargo, with signed audit trail; (d) Safi-specific overlay document (this file, finalized); (e) handover to TEAL ops
Fee band (indicative)1.2–1.6M MAD (≈ 110–145k EUR) fixed-fee
Payment30% kickoff, 30% at midpoint review, 40% on CBAM extract delivery
KPIs (gating final 40%)Broker uptime ≥ 99.5% over weeks 9–12; ≥ 95% of signals conformant per §7 envelope; CBAM extract independently auditable by TEAL
Risk reserve10% retained for hardening (TLS, ACL edge cases)

5.2 Beyond pilot (year 1, optional)

PhaseScopeIndicative fee band
Phase 2 — Safi expansionRemaining Safi areas (drying, sulphuric, fertilizer-DAP/MAP/NPK, all port loading)4–6M MAD over 6 months
Phase 3 — Jorf Lasfar mirrorReplicate at Jorf Lasfar with TEAL as primary integrator, IEIA as standards owner8–12M MAD over 9 months
Phase 4 — Group rolloutKhouribga, Benguerir, Youssoufia, Boucraâ; CBAM aggregator across all sitesContracted via TEAL framework

These are indicative bands for vault planning, not a commitment. Final pricing depends on procurement structure (direct, via TEAL, or via OCP Innovation Fund).

5.3 Strategic value to IEIA (not on the invoice)

  • Reference logo — OCP is the most consequential industrial reference in Morocco
  • Standard owner status — every subsequent OCP digital project references the IEIA-owned standard
  • CBAM precedent — the May 2027 declaration validates the standard at the highest possible stake

6. Why now

  • CBAM May 2027 first declaration — 25 months from today. A Safi pilot in Q3 2026 with Phase 2 in 2026-Q4 leaves comfortable margin.
  • OCP CBAM exposure is structural — phosphoric acid and DAP/MAP/NPK exports to the EU are large, predictable, and not commodity-cycle exposed (per 4Sight Holdings — Competitive Intelligence 2026 thesis).
  • No incumbent UNS — OCP-MS I-SENSE is closed-stack predictive maintenance, not a UNS. The position is open.
  • The standard existsMorocco UNS Standard v0.1 is drafted; there is no faster mover able to reference a published Moroccan standard.