NOTQIN KM System — Master Index

What this is. A complete inventory of every category of document a Moroccan industrial-B2B startup needs in its knowledge management system. For each: what it’s for, what you have today, what’s missing, when to touch it.

What this is NOT. A general-vault knowledge map — that’s Knowledge Base Map. This index is venture-specific — NOTQIN artefacts only.

For deeper detail on each ❌ critical artefact (what it is, why it matters, what blocks what, what propagates), see NOTQIN Critical Artefacts — Dependencies & Tracker.

How to read this. Status icons: ✅ exists & current · ⚠️ exists but stale or partial · ⏳ planned but missing · ❌ critical gap · — not applicable yet.


0. Map of the vault (where things live)

DigiTMPE/                              ← the Obsidian vault root
├── 00_Home/                           ← daily-touch surface, dashboards, this index
├── 01_Project Portfolio/NOTQIN Ecosystem/   ← per-module product status
├── 02_Knowledge Base/                 ← evergreen domain knowledge (Industry 4.0, AI…)
├── 03_Research Intelligence/          ← market & competitor & people intel
├── 04_Strategy/                       ← strategy, OS docs, feasibility, GTM
├── 05_Team and Collaboration/         ← pitch decks/HTMLs, letters, PRDs, charters
├── 06_AI Workflows/                   ← how-Claude-helps-deliver playbooks
├── 07_Learning/                       ← founder learning roadmap, courses tracked
└── (memory/)                          ← Claude auto-memory, outside the vault

1. Strategy & Direction (open every Monday)

The “where are we going” layer. Everything else cascades from these.

DocStatusFileWhat’s missing / next action
Team Onboarding & Alignment PackNOTQIN Team Onboarding & Alignment Pack 2026One-shot kick-off doc. Context floor + per-role required reading (Week 1, 8–12h) + 3-month deepening (Wave I–M) + structured 19-question feedback form. Alignment Meeting target 2026-06-07 → rewrite Path-to-Pilot with team input → Wave I starts 2026-06-09.
Path-to-Pilot — Team OrchestrationNOTQIN Path-to-Pilot — Team Orchestration 2026ACTIVE PM CANON. 5-person team (Ahmed/Elwalid/Imrane/Oussama/Mouad) · 6 workstreams · parallel-push pilot strategy (Auto Tier-2 + CBAM warm-intros) · Waves H–M · target first paid pilot LIVE ≈ mid-Aug 2026 · rituals Mon/Wed/Fri · edited weekly.
Industrial intelligence operating thesisNOTQIN Industrial Intelligence Operating Thesis 2026Canonical — binds UNS standard + sector packs + customer anatomy + Tier-2 sprint + PFE backbone + founder curriculum into one decision-layer thesis. 5-layer model + 9-stage roadmap + 5 Moroccan wedges.
Master operating manualNOTQIN Project Management OS
Sales / go-to-market manualNOTQIN Go-to-Market OS
Sector addendum — aero & autoNOTQIN GTM — Aeronautics & Automotive
18-month founder roadmapDigiTPME Founder Roadmap 2026-2027Refresh after sprint outcome
Current-quarter strategy⚠️Q3-2026-strategyRewrite OKR1 (still Hallotex-anchored — see project-notqin-customer-state)
Master / Market / Product / Partnership / Funding / Learning strategies04_Strategy/Master Strategy.md + 6 siblingsMost ≈ 3KB, lightweight — usable
Morocco-specific industrial strategyNOTQIN Morocco Industrial Strategy
Operating contextDigiTPME Operating Context
Exam-period operating overlayExam Period Operating System 2026-05Refresh per semester
Strategic thesis (one-pager)Strategic ThesisVerify still current
Master decision logTODO — currently embedded in each OS docPull into single 04_Strategy/Decision Log.md for cross-cutting decisions

2. Product (open weekly during build cycles)

What we sell, how it works, what’s shipped.

DocStatusFileWhat’s missing
Ecosystem map (overview)NOTQIN Ecosystem Map
Modular integration architectureNOTQIN Ecosystem — Modular Integration Architecture
Architecture playbookNOTQIN Architecture Playbook
Per-module statusNOTQIN Core · NOTQIN IEIA · NOTQIN Agent · NOTQIN Physics · NOTQIN Research · NOTQINVR · NOTQIN Grid · NOTQIN IEIA Plan 2026
MVP scope + acceptanceNOTQIN MVP Acceptance Criteria · NOTQIN MVP Agent Entrypoint · NOTQIN MVP Current App Inventory · NOTQIN MVP Evaluation Against Features · NOTQIN MVP Roadmap From Current State
Product spec (long)DigiTPME MVP — Product Specification v1Aging — refresh annually
PRDs (Phase 1 platform)05_Team and Collaboration/PRD — *.md (12 PRDs: GI-1/2/3, IA-1/2/3, SIBD-1/2/3, IT/OT/Integration)
Sector-pack catalog (master index)TODO — 01_Project Portfolio/NOTQIN Ecosystem/Sector Packs Index.mdOne-page index of all 5 live packs + status
Public product roadmapTODO — 01_Project Portfolio/NOTQIN Ecosystem/Public Roadmap.mdStrips internal detail; for sharing with prospects/partners
Release notes / changelogTODO — 01_Project Portfolio/NOTQIN Ecosystem/CHANGELOG.mdWave-by-wave shipping history, customer-facing
Security & compliance posture⚠️Scattered across Morocco UNS Standard v0.2 + PRD SIBD-2Consolidate into 04_Strategy/NOTQIN Security & Compliance Posture.md (CNDP + DGSSI + IEC 62443 + GDPR posture)

3. Customers & Sales (open weekly during outreach)

The pipeline from cold lead to signed contract.

DocStatusFileWhat’s missing
ICP + 5-stage funnelNOTQIN Customer Engagement Playbook
Pilot Trust Ladder + MUST-NOTsNOTQIN Pilot Playbook
Auto Tier-2 narrow thesisFeasibility Study — NOTQIN Auto Tier-2 Scorecard 2026Fill §6 What we heard after the discovery sprint
Auto target listAMICA Tier-2 Target List 2026Fill rows 4–12 with real names from AMICA directory
Aero target listTODO — 04_Strategy/GIMAS Aero Target List 2026.mdPhase-3 deliverable; build only after first Tier-A reference
Textile / cement / steel / agrifood target listsTODO — one each, parked until Phase 2+
Pricing menuNOTQIN Go-to-Market OS §6 + Aero/Auto addendum §6Validate via discovery sprint (H3)
SOW templates per Trust Ladder rung⚠️Rendered via trust-ladder-pilot-sow skillDrop a static SOW template into 04_Strategy/Templates/Pilot SOW R0-R4.md for offline reading
Discovery-call notes (per call)TODO — 03_Research Intelligence/Discovery Calls/<company>-<date>.mdOne file per call during the sprint
Pipeline tracker⚠️Embedded as table in GTM OS §2AConsider standalone 04_Strategy/NOTQIN Pipeline.md once > 10 accounts in motion
Lost-deal post-mortemsTODO — 04_Strategy/Lost Deals/<company>.mdCreate on first loss
Reference customers (logos, quotes)Not applicable yetBuild after first paying contract
Case studiesNot applicable yetFirst one ≈ 3 months after first paid pilot

4. Marketing (open weekly when in active campaign)

How prospects discover us; how we tell the story.

Doc / assetStatusFileWhat’s missing
Brand / design system directionNOTQIN — Design System Research & DirectionConvert to a concrete brand guidelines PDF (logo, colour tokens, type, voice)
Sales pitch — Industrial AI (long HTML)05_Team and Collaboration/NOTQIN — Pitch Industrial AI.html
Sales pitch — Sourcing & Banc IndustrielNOTQIN — Sourcing Prototype & Banc Industriel.{md,html}
Sales pitch — Maintenancepitch-maintenance.html
Sales pitch — Aero & Auto landing + lead formNOTQIN — Pitch Aero & Auto.htmlWire form to a real backend (Formspree / Worker) before going live
One-pager — AMICA scorecard defenseNOTQIN — AMICA Scorecard Defense.html
One-pager — GIMAS aero / Nadcap / FAITODOBuild after 3 discovery calls in aero (Phase 3)
One-pager — generic NOTQINTODO — sector-agnostic version for events
Whitepaper — AOG / physics-signature counterfeit detectionTODO — co-author with Ahmed Ratnani (UM6P)Highest-leverage credibility asset for Phase 3 aero play
Investor deck v1TODO — derive from Feasibility Study — DigiTPME 2026 + RoadmapGate-conditional on first paying contract
2-min demo video (screencast)TODO — factory-app + IEIA + CBAM Agent flowUnblocks every cold-email sequence
90-sec AS9100D audit-evidence demoTODO — Phase 3
90-sec IATF / PPAP demoTODOCould be Phase 1 if sprint validates
Founder LinkedIn content calendarTODO — 04_Strategy/Founder LinkedIn Cadence.md1 substantive post / week from founder
Public NOTQIN website (interim: ahmedbenahmed.com)⚠️Source drafted: NOTQIN Public Site — Content Skeleton · Deploy to ahmedbenahmed.com first; swap to notqin.ma once registeredOwned credibility — the pitch HTMLs are sales tools, not the home base
Press kit (logo bundle + founder bio + photo + key facts)TODO — 05_Team and Collaboration/Press Kit/Needed for any La Vie Éco / Lematin / Hespress placement
Brand voice / messaging guide⚠️Embedded in GTM OS §3 message treePull into standalone 04_Strategy/NOTQIN Brand Voice.md
Event calendarTODO — 04_Strategy/NOTQIN Events Calendar 2026-2027.mdGIMAS / AMICA / Aerospace Meetings / CGEM / 212 Founders / Auto Expo
Press placement logTODO — 04_Strategy/Press & Earned Media.mdEmpty until first placement
Pitch-preview folder05_Team and Collaboration/Letters/harrizi-pitch-preview/

5. Research & Market Intelligence (open when scoping or before a meeting)

What we know about the market, competitors, regulations.

DocStatusFileWhat’s missing
Moroccan Industrial Maturity DossierMemory: project_moroccan_industrial_maturity + linked vault files
Morocco UNS Standard v0.1 + v0.2 + 6 overlays02_Knowledge Base/Industry 4.0/
Aero MRO wrong-part-detection dossierAero MRO — Wrong-Part Detection on Test Cell 2026
OCP Research IntelligenceMemory: project_ocp_research + linked files
4.0 Solutions intelligenceMemory: project_40solutions
4Sight Holdings competitive intel4Sight Holdings — Competitive Intelligence 2026
ThreadCloud + Knowledge GraphsMemory: project_threadcloud_knowledge_graphs
MaestroHub / IIoT Platform Build intelIIoT Platform Build Intelligence — Open Source Stack 2026
Morocco Digital Transformation CommunitiesMorocco Digital Transformation Communities
UM6P CMSI seminar intelUM6P CMSI — AI National Security Seminar Intelligence 2026
Regulatory tracker (CBAM, CNDP, DGSSI, IATF)TODO — 03_Research Intelligence/Regulatory Tracker.mdSingle page tracking active regulations + deadlines + our exposure
Competitor master indexTODO — 03_Research Intelligence/Competitor Index.mdOne-page roll-up of 4Sight + Capgemini + MaestroHub + ThreadCloud + local SIs + SAP/Siemens channels
Industry analyst quotes / market sizingTODO — 03_Research Intelligence/Market Sizing References.mdCite-able numbers (Mordor, OBG, Policy Center) for decks
Vendor / partner profilesTODO — one per vendor under 03_Research Intelligence/Industrial Vendors/ThreadCloud exists; add HiveMQ, EMQX, MaestroHub, Ignition

6. People & Network (open before any meeting or intro request)

Who we know, who we want to know, who matters.

DocStatusFileWhat’s missing
People MapPeople MapRewritten 2026-05-24 as proper Type-2 KMS Knowledge Directory (13 sections, status codes, maintenance discipline). Closes the long-flagged ⚠️ underuse gap. Front-door for 03_Research Intelligence/People & Network/. Refresh monthly + after meaningful contacts.
Stakeholder RegisterNOTQIN Project Management OS §2
Personal Profile (founder)Personal Profile
Career StrategyCareer Strategy
Named-contact intelligence — Dr Driss HARRIZI03_Research Intelligence/People & Network/Dr Driss HARRIZI.md
Internal team dossiers — Elwalid · Imrane · Oussama · Mouad03_Research Intelligence/People & Network/{Elwalid,Imrane,Oussama,Mouad}.mdCreated 2026-05-24 — populated post-Alignment-Meeting with §5 feedback answers
Thought-leader dossiers — Walker Reynolds · Bob Vanderoulen · Travis Cox🟡03_Research Intelligence/People & Network/{Walker Reynolds,Bob Vanderoulen,Travis Cox}.mdStub + deep-research prompt 2026-05-24 — Ahmed runs prompt in Gemini / ChatGPT Deep Research, pastes results into the dossier sections
Folder index03_Research Intelligence/People & Network/README.mdConventions for adding new people
Named-contact intel — Ahmed Ratnani + Hamza KeurtiUM6P CMSI intel file
Named-contact intel — Walker ReynoldsMemory + 4.0 Solutions file
Advisor wishlistTODO — 04_Strategy/Advisor Targets.mdList 5–10 people to recruit as informal advisors (ex-OCP digital, ex-Safran ops, ex-Renault SQA, etc.)
Hires plan (Eng #1, Sales #1)Hires PlanCreated 2026-05-24 — current team table + 7 role categories + hiring discipline + recruitment channels + onboarding flow. Review monthly + after every pilot signed.
ENSA talent map⚠️Referenced in Feasibility Study — DigiTPME 2026Standalone 04_Strategy/ENSA Berrechid Talent Map.md (filières, PFE timeline, named profs)
Letters / outbound communications archive05_Team and Collaboration/Letters/Keep appending
Domain CEO Charters (aspirational team model)⚠️Domain CEO Charters — DigiTPME Operating Model (30KB, April)Reconcile with current reality (1 founder, not 12) — annotate at top

7. Operations (open daily, ritualized cadence)

How the work runs day-to-day.

DocStatusFileWhat’s missing
Home dashboardHome Dashboard
Current prioritiesCurrent PrioritiesRefresh weekly
Weekly review template + logWeekly Review + 00_Home/Reviews/Keep one per week — currently sparse
Dataview dashboardsDataview Dashboards
Obsidian setup guideObsidian Setup Guide
Wave delivery process⚠️Embedded in PM OS §8Standalone 04_Strategy/Wave Process.md if a team forms
Tools & subscriptions listTODO — 00_Home/Tools & Subscriptions.mdSingle page: Claude / Cursor / DigitalOcean / Cloudflare / domain / etc. with renewal dates & costs
Security incident response runbookTODO — 00_Home/Incident Response.mdWhat to do if a customer reports an outage / cyber event
SLA & support policyTODO — 04_Strategy/SLA & Support Policy.mdNeeded before first signed pilot
Vendor / supplier contact listTODO — 00_Home/Vendor Contacts.mdDigitalOcean account / Anthropic / Cloudflare / hardware suppliers — one page
Pilot post-mortem templateTODO — 04_Strategy/Templates/Pilot Post-Mortem.mdAfter each pilot

The money side, the legal entity, the contracts.

DocStatusFileWhat’s missing
Feasibility study (broad)Feasibility Study — DigiTPME 2026
Feasibility study (narrow Auto Tier-2)Feasibility Study — NOTQIN Auto Tier-2 Scorecard 2026
Funding strategyFunding StrategyRefresh after sprint
Financial model spreadsheetTODO — 04_Strategy/Finance/NOTQIN Financial Model.xlsx5-year MAD model, bear/base/bull; current numbers only exist in prose inside feasibility
Cash runway trackerTODO — 04_Strategy/Finance/Runway Tracker.mdCurrent bank balance + monthly burn + months remaining; updated monthly
Invoice / revenue logNot applicable yetBuild before first invoice
Pricing menu (canonical)GTM OS §6 + Aero/Auto §6
Quote / SOW templates⚠️Via skillStatic copy in 04_Strategy/Templates/
NDA templateTODO — 04_Strategy/Templates/NDA.mdNeeded for first customer discovery deep-dive
MSA / pilot agreement templateTODO — 04_Strategy/Templates/MSA.mdLawyer-reviewed; needed by first contract
Legal entity status (SARL / SAS)⚠️Mentioned in feasibilityStandalone 04_Strategy/Legal/Entity Status.md — incorporation date, tax ID, RC number, bank account
Trademark / IP filingsTODO — 04_Strategy/Legal/IP Register.mdRegister NOTQIN mark in Morocco (OMPIC)
CNDP declaration statusTODO — 04_Strategy/Legal/CNDP Status.mdRequired before any customer industrial data is processed
Investor data roomNot applicable yetBuild before first equity meeting
Grants pipelineTODO — 04_Strategy/Grants Pipeline.mdTamwilcom / MITC / IRESEN / Innov Invest application status

9. AI & Delivery Playbooks (open when planning a build)

How we use Claude / agents / skills to deliver.

DocStatusFileWhat’s missing
AI agent operating systemAI Agent Operating System
AI workflow overviewAI Workflow Overview
Claude Code power patternsClaude Code Power Patterns
Parallel execution playbookParallel Execution Playbook
Memory & context strategyMemory and Context Strategy
Reusable skills catalogNOTQIN Reusable Skills
Remotion demo strategyRemotion Demo Strategy for NOTQIN
CLI prompts library06_AI Workflows/CLI Prompts/
RAG workflows06_AI Workflows/RAG Workflows/
Skills source (~/.claude/skills/)Outside vault — 8 skills installedSymlink or skills-mirror.md in vault for visibility

10. Learning (open weekly)

Founder’s personal growth track.

DocStatusFileWhat’s missing
Learning RoadmapLearning Roadmap
Digital Transformation track07_Learning/Digital Transformation/
Books / courses logTODO — 07_Learning/Reading & Courses Log.mdWhat you read this quarter + key takeaways
Conference / event notesTODO — 07_Learning/Events Attended/One file per event with quotes, contacts, follow-ups

11. Memory (automatic, outside the vault)

Claude’s persistent memory at C:\Users\21260\.claude\projects\C--Users-21260-OneDrive-Documents-DigiTMPE\memory\. Maintained by Claude across sessions. Indexed by MEMORY.md. You don’t manually edit memory — Claude updates it on instruction. Useful for cross-session continuity (CMO roast learnings, customer-state correction, narrow-thesis decision).


Priority queue — what to build next

Order by ROI for current Phase-1 (Auto Tier-2 narrow thesis + first paying customer).

Phase 0 — shipped 2026-05-21 ✅

  1. ✅ Tools & Subscriptions inventory template
  2. NOTQIN BMC standalone (extract from PM OS §5)
  3. NOTQIN Business Model prose consolidation
  4. ✅ Regulatory Tracker v0 (18 regulations: 10 active + 8 watching)
  5. ✅ Advisor Targets v0 (5 named + 5 archetypes)
  6. ✅ Founder LinkedIn Cadence + LinkedIn Posts (4 drafted weeks)
  7. ✅ Trademark Filing Brief (OMPIC search + Class 9/42 recommendation + cost + timeline)
  8. ✅ Whitepaper proposal email to Ratnani drafted: Letters/2026-05-22 Email — Pr. Ratnani — whitepaper co-authorship proposal.md

Now (this week — founder action)

  1. 🔴 DECIDE THE BRAND QUESTION — Competitive Landscape — Moroccan Industrial Intelligence 2026 §7 surfaced Smartex.ai (Portuguese, €40M+, H&M + Amazon investors). Three paths laid out (A keep / B rebrand / C modifier). CMO recommendation = Path B (rebrand now). Trademark filing + OMPIC search are downstream of this decision.
  2. ⏳ Send the Ratnani email + prepare the 2-page framing-note attachment
  3. ⏳ Fill in Tools & Subscriptions actual costs + renewal dates
  4. ⏳ Fill rows 4–12 of AMICA Tier-2 Target List 2026 with real names from AMICA directory + Kerix
  5. ⏳ Run the 5-day discovery sprint
  6. ⏳ Fill §6 What we heard in Feasibility Study — NOTQIN Auto Tier-2 Scorecard 2026

Next 30 days (post-sprint, if GO)

  1. Investor deck v1 — derive from feasibility + roadmap. Gate-conditional on first paying contract.
  2. ⚠️ Public NOTQIN site — source draft complete (NOTQIN Public Site — Content Skeleton); deploy to interim domain ahmedbenahmed.com this week, swap to notqin.ma once registered.
  3. 2-min demo video (one Saturday). Unblocks every cold-email sequence.
  4. Founder LinkedIn cadence doc + 4 ready-to-post drafts.
  5. Press kit (logo bundle + founder bio + photo + key facts) — for first journalist contact.
  6. Financial model spreadsheet — 5-year MAD bear/base/bull. Prose-in-feasibility doesn’t survive a CFO read.
  7. Regulatory tracker + CNDP declaration + Trademark filing — legal hygiene before first customer.

After first paying contract

  1. Case study #1 (anonymous if needed) — the moment a pilot ships, capture it.
  2. Reference call list + permission tracking.
  3. Hires plan refresh — Eng #1 sourcing channels, comp brackets.
  4. Master Decision Log (cross-cutting) — pull strategic forks (Hallotex reclassification, narrow-thesis pivot, etc.) into one file.

Phase 3 (aero credibility play, post-2-customers)

  1. AOG / physics-signature whitepaper co-authored with Ahmed Ratnani (UM6P).
  2. GIMAS aero target list.
  3. AS9100D + IATF demo videos (90s each).
  4. One-pager — GIMAS / Nadcap / FAI.

Anti-list — what NOT to build right now

Discipline matters more than completeness. These are tempting but wrong-cost-for-current-stage:

  • More sector GTM addenda (textile / cement / steel / agrifood). The aero+auto one is enough; rest stays in main GTM OS until they unlock.
  • More pitch HTMLs. Three exist; the next pitch asset should be a video or a whitepaper, not another landing page.
  • Re-writing the April Feasibility Study. Already supplemented by the narrow one.
  • Domain CEO Charters refresh. Aspirational document; reconcile only when an actual team exists.
  • Public roadmap before first customer. Risky — over-promises and audit-able by competitors.
  • Polished case studies before real customers. Synthetic case studies destroy credibility if discovered.

How to keep this index alive

  • Monthly (1st business day, during PM OS monthly ritual): scan each section, update status icons, move items between What you have and What’s missing.
  • After any major build: flip the entry from ⏳ to ✅, add the file path.
  • After any sprint or pivot: add a row in the priority queue and reorder.
  • If three months pass with no edits: the index has decayed — assume it’s lying. Re-audit by walking the vault folder by folder.

Last full audit: 2026-05-21. Next due: 2026-06-21.