Oussama
Role in NOTQIN
OT engineering — auto sector focus. Owns the auto half of WS-E per NOTQIN Path-to-Pilot — Team Orchestration 2026:
- Audit auto sector pack against Morocco UNS Standard v0.2
- Simulator validation
- Customer-site OT integration prep
- Make
packages/sector-packs/auto/field-ready, not just simulator-correct
Working files
- oussama-notes — onboarding reading notes
- Sector Pack Audits/auto-2026-05 — Wave H audit deliverable
- Field Readiness Checklist v1 — co-reviewer with Mouad
- Feedback — Oussama 2026-06 — Alignment Meeting feedback form
Required reading (per Onboarding Pack §2.C)
Operating Thesis §4 + §5 Stages 1-4 · ISA-95 end-to-end · HiveMQ MQTT Essentials · OT-UNS Reference Card · Sparkplug B spec (Eclipse Tahu) · Morocco UNS Standard v0.1 + v0.2 + auto overlay · Auto sector pack (code repo) · Aero MRO wrong-part detection · Customer Anatomy Appx A · PFE Backbone B3.
What we know
- IA student with OT context (per Ahmed’s framing 2026-05-24)
- Likely ENSA Berrechid SIBD or similar
- Time commitment: TBC at Alignment Meeting (student schedule)
- Exam-period exposure: high (Moroccan engineering school calendar)
What’s unknown
- Specific PLC vendor experience (Siemens / Schneider / Allen-Bradley / Omron)
- Prior on-site plant exposure
- French / English coding-vocab comfort
- Equity expectations
→ Captured via the Feedback — Oussama 2026-06 form before 2026-06-05.
Standing-context notes
- 2026-05-24 — onboarded as OT engineer (auto focus). Onboarding pack shared.
See also
- People Map
- Mouad (sibling OT engineer, CBAM/steel focus)
- NOTQIN Path-to-Pilot — Team Orchestration 2026 §1, WS-E
- NOTQIN Team Onboarding & Alignment Pack 2026
- Morocco UNS Standard v0.1