Mouad

Role in NOTQIN

OT engineering — CBAM / steel sector focus. Owns the CBAM/steel half of WS-E per NOTQIN Path-to-Pilot — Team Orchestration 2026:

  • Audit CBAM/steel sector pack against YNNA Steel overlay
  • MQTT / Sparkplug B conformance
  • Field-readiness checklist (ships v1 from Wave H — the OT-side artifact that prevents pilot-site surprises)
  • Read EU CBAM regulation directly (2023/956 + 2023/1773), extract data-field schema

Working files

Required reading (per Onboarding Pack §2.D)

Operating Thesis §4 + §5 Stages 1-4 + §8.E · ISA-95 · HiveMQ MQTT Essentials · OT-UNS Reference Card · Sparkplug B spec · Morocco UNS Standard v0.2 + YNNA Steel overlay · CBAM Regulation note · EU regulation 2023/956 + 2023/1773 directly · CBAM Agent module (code repo) · steel sector pack · Moroccan Industrial Maturity Dossier (steel + cement + OCP) · PFE Backbone B2.

Why this role is gating

The YNNA Steel CBAM forcing function (Jan 2026 fee phase) means WS-E CBAM/steel readiness gates the WS-D CBAM warm-intro track’s ability to convert. If Mouad’s pack is field-ready before Oussama’s auto pack, the CBAM track could deliver pilot #1 before the auto track.

What we know

  • IA student with OT context
  • Likely ENSA Berrechid SIBD or similar
  • Time commitment: TBC at Alignment Meeting
  • Exam-period exposure: high

What’s unknown

  • Specific steel-process telemetry exposure (EAF / BOF / continuous casting)
  • Regulatory-document reading comfort (CBAM is dense)
  • Equity expectations

→ Captured via the Feedback — Mouad 2026-06 form before 2026-06-05.

Standing-context notes

  • 2026-05-24 — onboarded as OT engineer (CBAM/steel focus). Onboarding pack shared.

See also